Convert anything, at global scale.
200+ formats and automation APIs that feels instant.
CONVERT
From
To
Drop files or choose a source
Upload multiple files at once, mix formats, and fine-tune every conversion with format-aware settings.
Max 2GB per file · Drag & drop ready · Mixed file types welcome
OFF at a glance
OFF
OFF is strongly associated with the Geomview and Geometry Center ecosystem and became one of the classic lightweight ways to store polygon meshes in research and educational contexts.
IFC at a glance
IFC
IFC grew out of the industry's need for open BIM interoperability so building projects would not be trapped inside a single authoring vendor's data model.
Format comparison
| Feature | OFF | IFC |
|---|---|---|
| File type | Not available | Not available |
| Extensions |
|
|
| MIME type |
|
|
| Compression / quality | Not available | Not available |
| File size characteristics | Not available | Not available |
| Compatibility | Not available | Not available |
| Editability | Not available | Not available |
| Created year | Not available | Not available |
| Inventor | Not available | Not available |
| Status | Not available | Not available |
| Transparency | Not available | Not available |
| Animation | Not available | Not available |
| Primary use cases |
|
|
| Common software |
|
|
| Archival suitability | Not available | Not available |
| Metadata handling | Not available | Not available |
| Delivery profile | Not available | Not available |
| Workflow fit | Not available | Not available |
| Layer support | Not available | Not available |
| Vector scaling | Not available | Not available |
| Structured data | Not available | Not available |
When to use each format
When to use OFF
- design authoring
- review handoff
- manufacturing exchange
- Extremely simple for polygon mesh interchange.
When to use IFC
- design authoring
- review handoff
- manufacturing exchange
- Strong role in open BIM interoperability.
FAQs
Why convert OFF to IFC?
Choose IFC as target when the target workflow needs BIM semantics, cross-vendor building-model exchange, or coordination between architecture, engineering, and construction systems.
What changes when converting OFF to IFC?
Convert to IFC when the target workflow needs BIM semantics, cross-vendor building-model exchange, or coordination between architecture, engineering, and construction systems. It is appropriate for design handoff, federated model review, and lifecycle building information exchange. Use IFC when structured building data matters more than lightweight visualization alone.
What should I review after converting OFF to IFC?
After conversion, review these destination checks: Open converted output in BIM tools and verify behavior on real samples; Compare output against the expected precise quality profile; Real-world interoperability still depends on how faithfully authoring tools map their internal models.
How can I keep quality stable in OFF to IFC conversion?
Run representative samples, keep settings deterministic, and monitor these risks: It is heavier and more semantically demanding than simple mesh interchange; Real-world interoperability still depends on how faithfully authoring tools map their internal models; Validate destination compatibility before large-batch conversion.